The entire lower unit had to be gutted and refurbished, including all electrical/heating, drywall, flooring. There was significant structural repairs needed due to the long time exposure to the elements.
Latest posts by Cari (see all)
- Hiring Contractors During High Demand Times - July 22, 2026
- Roof, Windows & Siding - May 22, 2026
- Exterior Home Care - March 18, 2026
